Under construction — 31%

Binghatti Skyhall: Handover Date & Completion Status

Binghatti · Business Bay · 728 units — tracked live against the DLD project registry.

31%
official build progress
August 2026
expected completion (DLD estimate)
728
units
Construction progress 31%

Registry readings

  • 17 Aug 2026 31% · exp. Aug 2026
  • 13 Aug 2026 31% · exp. Aug 2026
  • 10 Aug 2026 31% · exp. Aug 2026
  • 6 Aug 2026 31% · exp. Aug 2026
  • 3 Aug 2026 31% · exp. Aug 2026
  • 30 Jul 2026 31% · exp. Aug 2026

The progress chart appears here once the registry reading starts moving.

Last verified against the DLD registry: 17 Aug 2026 · updated twice weekly

Project facts — DLD registry

DLD project no.
3504
Registered developer
Binghatti Developers Fze
Construction start
Feb 2025
Registered project value
AED 385.0M
Authority
Dubai Development Authority (DDA)
Apartments
728

Official description: 3B + G + 3P + 29 RESIDENTIAL FLOORS + 1MECH. + ROOF

Binghatti Skyhall in context

Researched & verified editorial — updated 3 Jul 2026

What Is Being Built

Skyhall is a single tower of roughly 34 levels — two basements, a ground floor, three podium floors and 29 residential floors topped by a roof level, per Binghatti's own project documentation. The residential stacking plan skips family-sized layouts entirely: 489 studios and 228 one-bedroom apartments occupy the tower, with 11 retail units at grade. Unit sizes run from around 396 to 1,032 square feet across the two typologies, per listings on Property Finder and Bayut. Studios are priced from AED 985,000 and one-bedrooms from roughly AED 1.85 million at the portal level, which puts entry pricing above AED 2,400 per square foot for the smallest units.

Business Bay in Practice for This Product Tier

A studio-and-one-bedroom-only building is a bet on renters, not families. Business Bay's residential stock already skews toward exactly that tenant — young professionals working nearby in DIFC and along Sheikh Zayed Road — and the district has little competing family-sized inventory to begin with. That concentration cuts both ways for a buyer: it simplifies leasing (a narrower unit type means faster comparables and a deeper renter pool) but it also means Skyhall competes directly against a large, already-built base of studios and one-beds in neighboring towers rather than differentiating on layout.

Binghatti's Delivery Record

Binghatti is building several towers in Business Bay at once, which matters for anyone assessing construction and handover risk on any single one of them. Binghatti Aquarise, a waterfront tower a short distance away, comprises roughly 1,598 residential units and 28 retail outlets across 25 residential floors, with a stated completion window of Q1–Q2 2027. Separately, the developer's joint venture with Jacob & Co, Burj Binghatti Jacob & Co Residences, is a 104-floor, 557-metre supertall under construction in the same district, targeted for completion around Q2 2026, with unit types ranging from two to seven bedrooms — a different buyer segment entirely from Skyhall's studio-heavy mix. Running a compact rental-focused tower alongside a waterfront mega-project and a supertall simultaneously is a useful data point on how thinly Binghatti's site management and subcontractor base may be spread across Business Bay in the same delivery window, though it is not on its own evidence of risk to any specific project.

Payment Plan

Skyhall is sold on a 70/30 structure: 20% at booking, 50% staged through construction, and the remaining 30% due on completion. That skews more front-loaded than plans seen on some other Business Bay launches, which push a larger share to a post-handover schedule — buyers comparing Skyhall against those alternatives are effectively trading a lower cash requirement at handover for a higher cash requirement during the build.

What Handover Will Mean

Business Bay's studio segment has been a strong performer on the rental side. Brokerage data for 2026 puts average studio rents in the district at roughly AED 68,000–85,000 a year, with gross yields on compact units commonly cited in the 6–9% range depending on building and finish level — ahead of Downtown Dubai's typical 6–7%. Business Bay also recorded the sharpest year-on-year rent growth of any major Dubai submarket in Q4 2025, up roughly 18% against a citywide average closer to 12%. For a studio-heavy delivery landing in the same district, that rental backdrop is the more relevant benchmark than the sale price alone — it sets the ceiling on what a Skyhall studio can realistically earn once handed over into a market that already has a large, established base of comparable stock.

What to do now — early construction (31%)

  • Keep instalments strictly to the payment plan and confirm every payment lands in the project's escrow account — never a personal account.
  • Model your handover cash-out early: final instalment + 4% DLD fee + costs — the DLD Fee Calculator does the math.
  • Watch this page — expected dates at this stage move often, and we'll email you when the registry reading changes.

Final payment due at handover?

Most Dubai payment plans put the largest instalment at handover. Size your mortgage before the notice arrives.

Before you accept the keys

A snagging inspection before handover puts the defect list on the developer, not on you. Vetted inspectors in our directory.

Browse the Directory

Frequently asked

When will Binghatti Skyhall hand over?

The DLD registry lists Binghatti Skyhall at 31% construction with an expected date of August 2026 — the registry's own estimate, which routinely slips. This page re-verifies twice a week.

What percentage complete is Binghatti Skyhall?

The official DLD registry figure is 31%. This is the escrow-audited construction percentage, not a marketing estimate.

Is Binghatti Skyhall delayed?

It is on the registry's timeline so far — no material slippage recorded since we started tracking. Bear in mind DLD dates are optimistic and can still move.

Where does this data come from?

Directly from the Dubai Land Department's public project registry — the escrow-audited construction percentage and official project status, not developer marketing. A project only counts as handed over when its registry status reads FINISHED. See all deliveries on the monthly handover statistics pages.